Sakhalin-1 Project

2004–2007 

Client – ECC-VECO, LLC / Fluor Daniel Eurasia Inc. Construction of shift camp, arrangement of site access roads, installation of external process pipelines, reinforced concrete structures, OPF territory landscaping and finishing.

2006–2011 

Client – ECC-VECO, LLC / EXXON NEFTEGAS LIMITED. Personnel provision for maintenance operations at Orlan offshore platform, oil pipeline, block valve stations, OPF Chayvo.

2006 

Client – CJSC Globalstroi-Engineering / ЕХХОN NEFTEGAS LIMITED. De-Kastri. Tie-in works, hydrotesting.

2006 

Client – ECC-VECO, LLC / Fluor Dаniel Eurasia Inc. OPG Chayvo - Botasino gas pipeline. Botasino scraper acceptance and start-up unit, ROW preparation, arrangement of temporary road and access roads, gas pipeline arrangement, weld joints NDT, gas pipeline hydrotesting, ECP arrangement, installation of block valves, pig launchers and receivers, arrangement of FOC, ROW reinstatement.

2007–2011 

Client – ECC-VECO, LLC / Fluor Dаniel Eurasia Inc. Odoptu First Stage Production. Infrastructure and preliminary works. Contractor's construction and assembly works, transportation services, personnel provision, engineering and design, industrial products manufacture, supplies provision.

2007 

Client – Shelf Technologies, LLC. Project - Koshagan. Module 10, Astrakhan. NDT of steel structures.

2008 

Client – CJSC Neftegazstroi Limited. OPF Chayvo - De-Kastri OET main oil pipeline. Reinstatement of ROW, including crossings arrangement through the pipelines.

2008–2009 

Client – ECC-VECO, LLC / Fluor Daniel Eurasia Inc. Contractor's construction and assemble works under Odoptu well site arrangement, pipeline from Odoptu North Well Site to OPF Chayvo with block valves, pipelines' ties-in at OPF Chayvo and upgrade of existing roads and bridges, temporary camps arrangement to support operations under the Project.

2010–2011 

Client – ECC-VECO, LLC. Chayvo OPF Reconstruction. Contractor's construction and assembly works - arrangement of onshore pipelines and fiber optic cable lines under OPF Chayvo Reconstruction Project.

Soil cleaning and subgrading, grading, arrangement of crushed stone top coating, earthworks, arrangement of underground utilities, arrangement of temporary bypass road,  installation of drainage facilities, installation of temporary construction fencing, arrangement of access road, gates installation, lighting installation.

2010–2011 

Client – Aker Solutions. Arkutun-Dagi field development. Offshore gravity base structure (GBS). Non-destructive testing.

2011 

Client – CJSC RN-Shelf Far East. Prospecting and appraisal wells No.1 and No.2 at Lebedinskoye, Odoptu, Okha district. Well site. Preparatory works, earthworks, geotextile placement, pipes installation, arrangement of access and bypass roads.

2011–2012

Representative office of Caspean Veco Limited in Yuzhno-Sakhalinsk. Odoptu First Stage Production Project in Okha district. Technical maintenance of machinery, equipment, vehicles, spare parts procurement and supply.